RESEARCH DIRECTORATEPX–TB–027
REVISION 1 / PUBLIC EDITION
PARALLAX / Technical brief
The earlier clock
The controller had not spoken. The hydraulic plant had already moved. Three retained windows distinguish the two events.
Tomas Eide / Field Operations; PARALLAX timing review
SOURCE DATE 2026.07.13 / RELEASE DATE ABOVE
01 / The omitted channel
The independent accelerometer records a small mechanical onset 96 milliseconds before the command in the original window. A plant-pressure channel records preparation in the same interval. E2-A responds 14 milliseconds after that local onset. The control-room display used the command as time zero and omitted the earlier physical input. Its timestamps were accurate; its account of what began the event was incomplete.
02 / Timing changed
With plant preparation moved earlier and the main command held at zero, a retained comparison window places the precursor at −211 milliseconds and the panel response at −195 milliseconds. The response follows the precursor by 16 milliseconds. This intervention supports a local-input explanation for the apparent anticipation. It does not identify every physical feature to which the material responds.
03 / Preparation isolated
In a retained window with the preparation path mechanically decoupled, no precursor is detected above the witness threshold. The command occurs at zero, the main load at +14 milliseconds, and the panel response at +32 milliseconds. Relative to the first detected local load, the response follows by 18 milliseconds. “No precursor detected” is the scope of the observation; it is not proof that every possible earlier signal was absent.
04 / What the public extract contains
The evidence desk presents these three selected windows. The nominal values are rounded to the nearest millisecond; the estimated uncertainty of each reported offset relative to the command is ±2 milliseconds. A conservative uncertainty bound for a difference between two offsets is ±4 milliseconds. The extract is not a count of all trials, a detection rate, or a complete waveform. Changing the displayed reference subtracts the same origin from every event. It changes no event order.
05 / Remaining work
In the three released windows, the lead on the command clock is explained sufficiently to withdraw the anticipation interpretation. The commissioning team still cannot reproduce E2-A’s exact response in a newly fabricated panel. That is a different question. A corrected display has not explained the material. One further window from the same series is retained. Preparation was isolated and every witness channel was recording. The Methods Office and Material Behavior have not agreed a description of it, and it is not part of this extract.